The telescope is now being re-assembled,
after an interval of quite a few weeks, when major components
were being worked on.
An extension to the mounting pillar
has been designed and fabricated. This lifts the telescope
up 0.5m and will permit us to observe lower declinations
in the sky.
The pillar extension also incorporates fine adjustment
provision for altitude and azimuth alignment.
We have cleaned and painted the polar
axis and fitted it to the pillar extension.
The polar drive wormwheel has been
refitted. During this, the clutch arrangement was modified
for better operation.
The next stage is to attach the polar drive worm and
motor assembly.